emory je dunn hok2.png

Emory Health Sciences Research Building

Construction Update Page

  • Home

  • Project Updates

  • Jobsite Vlogs

  • Groundbreaking

  • More

    Use tab to navigate through the menu items.
    • All Posts
    • safety
    • office trailers
    • erosion
    • fencing
    • web camera
    • HSRB-I
    • grading
    • tree removal
    • permitting
    • utilities
    • abatement
    • storm water
    • test pits
    • hydrovac
    • delivery of materials
    • photo/video documentation
    • traffic
    • line drilling
    • rock removal
    • trucks
    • soil removal
    • leveling
    • groundbreaking
    • dump trucks
    • holidays
    • erosion
    • rock drilling
    • exploratory digging
    • loading dock
    • excavation
    Search
    Construction Update - 10/11/19
    emoryhsrb2
    • Oct 18, 2019

    Construction Update - 10/11/19

    This week’s (10/7 – 10/11) scheduled construction activities included:: Tree removal on site continues. Small tree/shrub relocation...

    ©2019 by Emory Health Sciences Research Building Construction. Proudly created with Wix.com